Back to Blog
the-design-process | the-insider

The Timeline: A Realistic Look at How Long a Luxury Fit-Out Takes in Dubai

Mark Davies
6 min.
19 July
The Timeline: A Realistic Look at How Long a Luxury Fit-Out Takes in Dubai

We provide a transparent breakdown of the timeline for a typical project, from design approval to the final handover.

A luxury fit-out is a complex, multi-layered process. It's a journey that requires precision, a deep understanding of the local market, and a realistic timeline. We believe that transparency is key to a successful partnership. Here is a realistic look at how long a luxury fit-out project typically takes in Dubai.

### Phase 1: The Design Phase (4-8 Weeks)

* **Initial Consultation:** We begin with an initial consultation to understand your vision, your budget, and your timeline. * **Concept Development:** We create a comprehensive design concept, including moodboards, floor plans, and 3D renderings. * **Material Selection:** We work with you to select all the materials, from the flooring to the light fixtures. * **Final Approval:** Once the design is approved, we create a full set of technical drawings that are used for the construction phase.

### Phase 2: The Approval Phase (4-6 Weeks)

* **Government Approvals:** We submit all the necessary drawings to the relevant government authorities, such as the Dubai Municipality and Civil Defense. This is a critical step that ensures your project is in full compliance with all local laws and regulations.

### Phase 3: The Construction Phase (8-16 Weeks)

* **Demolition:** We begin with the demolition of the old space. This is done with precision and care to minimize disruption. * **Structural Work:** We complete any necessary structural work, such as moving walls or installing new windows. * **Fit-Out:** This is where the magic happens. We install the flooring, the ceilings, the walls, and all the custom cabinetry and fixtures. * **Final Touches:** We install the furniture, the art, and all the final decorative elements.

### The Handover Phase (1-2 Weeks)

* **Final Inspection:** We conduct a final walk-through to ensure that every detail is perfect before we hand over the keys to your new home. * **Final Documentation:** We provide you with a comprehensive set of documents, including all the warranties and manuals for your new appliances and fixtures.

The timeline for a luxury fit-out can vary depending on the size and complexity of the project. However, by following a structured process and working with a professional team, we can ensure that your project is completed on time and on budget.

Explore

Our Comprehensive Services

Ready to Transform Your Space?

Let's collaborate to create a space that reflects your unique style and enhances your lifestyle.

Have questions? Feel free to reach out to us or call us at +971 55 407 3275